He was told that the walls would need to have a fire resistive construction and also the eave overhang would need to be rated 1 hour as well because it encroaches into the setback.
1 hour roof over hang protection detail.
1 hour rated wall and protected eave overhang soffit board 1 2 cdx ply 2 x 4 block 2x framing 5 8 type x gypsum sheathing siding 5 8 type x gypsum wallboard structural sheathing as required fascia approved roof covering alternate location of gwb or 2x blocking if no ceiling finish is provided 1900 sw 4th avenue suite 5000 portland or 97201.
Overhangs such as roof eaves and soffits are one element needing protection.
Roof overhangs must have a one hour fire protection on the underside when less than 5 from the property line and cannot project closer than 2 from the line.
Soffits a soffit encloses the underside of sloped or flat roof overhangs.
See attached image we are hoping to replicate this in the addition.
Wall framing whichever is closer to one of the following.
However a garage located within 2 of the property line is permitted to have a 4 inch roof eave projection.
Hi all we need to provide one hour rated protection for under eaves on a residential property remodel.
The detail he gave us one coat stucco sub shows 2 layers of type x screwed into the rafter tails 3 5 8 with lath and stucco over that.
To an imaginary line between two buildings on the lot.
Madesign history contact.
The existing open eaves have t g sheathing with exposed rafter tails and 2x blocking b w rafters.
To the closest interior lot line.
Overhangs can be open in which the trusses rafters and decking are exposed see figure 1 or enclosed by a soffit.
Use flat horizontal soffits see figure 3 instead of attaching the soffits to the sloped joists which creates sloped soffits.
Walls less than 5 feet from the property lot line must be of a listed hour fire1 resistant construction.
An overhang protects the upper portion of the wall that it is attached to from rainfall and it also shades the windows under it from the sun.
The ibc provides options while the irc has only one method of compliance.
Enclose overhangs with soffits that have a minimum 1 hour fire resistance rating to prevent embers and hot gases from making contact with the joists rafters or trusses or the underside of the roof decking.
The ibc in section 705 2 3 permits the use of type iv construction fire retardant treated wood or 1 hr fire resistance construction for combustible projections.