Use flat horizontal soffits see figure 3 instead of attaching the soffits to the sloped joists which creates sloped soffits.
1 hour roof rake detail.
D horizontal membrane 52 shaft wall used in a horizontal plane.
Our range of drawings can help pros plan projects more effectively by utilizing designs for a fire rated ceiling assembly.
There is no 1 hr.
According to the book commercial drafting and detailing a typical one hour fire rated wall consists of 2x4 studs spaced 16 inches from the center of one stud to the center of the next covered by 5 8 inch type x gypsum board.
Terms are used to break down the various areas of a roof and a rake is one of many roof sections.
Wood framed including dimensional lumber engineered joist and truss.
Here you can find drawings for our ul fire rated floor assemblies and ul fire rated ceiling assemblies.
W taped joints veneer ties.
It is a term that describes the sloped sides of a gable end.
C roof ceilings45 51 steel framed including steel bar joist framing steel c joist framing steel truss and steel roof deck.
The detail drawings are grouped by details and can be downloaded below in dwg or pdf format.
Roofing terminology may be difficult to understand unless you are a builder or roofer.
Roof detail high wall low roof 01 030 0804.
Brick veneer cmu backup rigid insul.
Roof detail pitched roof to high wall 01 030 0751.
Type x gypsum board is wallboard to which non combustible fibers have been added.
The rake is not exactly on the roof.
Firestone has developed cad drawings of its tpo installation details to assist roofing professionals with the specification of firestone tpo roofing systems.
A minimum 1 hour fire resistance rating to prevent embers and hot gases from making contact with the joists rafters or trusses or the underside of the roof decking.
Hold your cursor over the file name to view when a drawing was last updated.